Hyderabad Raipur Economic Corridor – Overview and Current Progress

The Hyderabad Raipur Economic Corridor, also referred to as the Hyderabad-Raipur Expressway, spans a distance of 568 kilometers. This under-construction road project by NHAI is designed as a 4-6 lane semi access-controlled highway, connecting the states of Telangana, Maharashtra, and Telangana.

As part of the Bharatmala Pariyojana Phase I program, construction is underway for this combination of brownfield and greenfield corridor, with the primary objective of enhancing the efficiency of freight movement and promoting exports.

The project consists of a series of separate highway upgrades, ranging from 4 to 6 lanes, that are interconnected to form the economic corridor. Notably, its greenfield section of 325 kilometers will establish the connection between Bellampalli, Gadchiroli, and Durg.

The northern terminal of this economic corridor will be located south of Bhillai on the Durg-Raipur-Arang Expressway. On the southern side, the corridor will be linked to Hyderabad’s Regional Ring Road (RRR) and Outer Ring Road (ORR).

While NHAI’s Detailed Project Report (DPR) is not yet available online, the completion deadline for this economic corridor is set for August 2025.

Also Read- 10 Upcoming Mega Projects in Telangana

Key Project Details:

Total Length 568 kilometers
Length of Greenfield Section 116 kilometers
Estimated Cost of Greenfield Section INR 3,178 crores
Lanes 4
Deadline August 2025
Owner National Highways Authority of India (NHAI)
Project Model Engineering, Procurement, and Construction (EPC)

Current Progress: The Hyderabad-Raipur Economic Corridor is scheduled to be completed by August 2025, as per the current deadline.

Route Map:

Hyderabad Raipur Economic Corridor
Hyderabad Raipur Economic Corridor

A PDF route map of the Hyderabad-Raipur Economic Corridor will be provided as soon as it becomes available. The project comprises three road projects:

Durg-Gadchiroli-Bellampalli (greenfield section) spanning 325 kilometers

Bellampalli-Mancherial (brownfield upgrade of NH-363 by Adani Enterprises) covering 35 kilometers

Mancherial-Hyderabad (brownfield upgrade of SH-1) extending over 208 kilometers

Tenders & Contractors: Updates regarding tender notices and contractor details will be provided in this section once published.