Mysore-Madikeri Economic Corridor – Overview and Status Update

The Mysore Madikeri Economic Corridor, also known as the Mysore-Madikeri Expressway, spans a length of 115 kilometers. This NHAI-approved road project is a 4-lane semi access-controlled highway with a route alignment located in Karnataka.

Under the Bharatmala Pariyojana Phase I program, the construction of this predominantly greenfield corridor aims to connect Coorg, reducing travel time, and improving freight movement efficiency to boost exports.

The project’s feasibility report was prepared by Feedback Infra, and the land acquisition process commenced in 2020.

Included within this economic corridor is the 92.3-kilometer Mysore-Kushalnagara Expressway project. Its greenfield alignment will run parallel to the existing national highway NH-275, connecting Guddehosur to Srirangapatna and linking with the 119-kilometer Bangalore-Mysore Expressway project.

The foundation stone for this project will be laid by Prime Minister Narendra Modi in March 2023. Phase 2 of the project plans to extend it from Madikeri to Bantwal, located just east of Mangalore.

While NHAI has not yet made the Detailed Project Report (DPR) available online, the project is scheduled to be completed by 2026. Its objective is to reduce the travel time between Mysore and Madikeri from the current 2-3 hours to just over an hour.

Also Read-  15 Stunning Upcoming Mega Projects in Karnataka 

Key Project Details:

  • Estimated Cost (Mysore-Kushalnagar only): Rs. 3,470 crore
  • Total Length: 115 kilometers
  • Lanes: 4
  • Deadline: 2026
  • Owner: National Highways Authority of India (NHAI)
  • Project Model: Hybrid Annuity Mode (HAM)

Current Status:

The project’s foundation stone is set to be laid by Prime Minister Narendra Modi in March 2023. Bidding is currently underway for civil construction packages 2-5.

Project Route:

The Mysore Madikeri Economic Corridor comprises two sections:

  • A 22-kilometer brownfield-upgraded section of NH-275 from Madikeri to Guddehosur, partially access-controlled.
  • A 92.3-kilometer greenfield Mysore-Kushalnagar Expressway (Guddehosur to Srirangapatna), fully access-controlled.

Route Map: .

A PDF route map of the Mysore Madikeri Economic Corridor will be provided when available. Here’s a map depicting its alignment between Madikeri to Guddehosur (top map) and Yalachahalli to Srirangapatna (bottom map).

Mysore Madikeri Economic Corridor
Mysore Madikeri Economic Corridor

Tenders & Contractors for Mysore-Madikeri Economic Corridor:

The Mysore Madikeri Economic Corridor has been divided into 5 civil packages, each with a 24-month deadline. Tenders for packages 2-5 were invited under the Hybrid Annuity Mode (HAM) in September 2022, with a 730-day (2-year) deadline.

Here are the details of the packages and their respective contractors or status:

Package Length (km) Description Contractor
Package 1 22 Madikeri to Guddehosur Tender Notice is Pending
Package 2 22.7 From Km 122.200 near Guddehosur-Kushalnagara Bypass to Ch. Km 144.900 at SH-21 Hassan-Periyapatna Road Junction DY Uppar and Sons
Package 3 24.1 From Km 144.900 near Hemmige Village SH21 Hassan-Periyapatna Road Junction to Km 169.000 near SH86 Ramanathapura-Terakanambi Road KR Nagar Junction Ramalingam Construction Company Pvt. Ltd.
Package 4 26.5 From Km 169.000 Ramanathapura Terakanambi Road KR Nagar Junction in Hunsur to Km 195.550 near Yalachahalli at SH-117 Yelawala-KR Nagara Road Junction KNR Constructions Ltd.
Package 5 18.985 From Km 195.550 near Yalachahalli at SH-117 Yelawala KR Nagara Road Junction to Km 214.535 joining Srirangapatna Bypass near Paschima Vahini KNR Constructions Ltd.