Bharatmala Contractors
Bharatmala Pariyojana is a umbrella programme under which 24,800 kms of highway projects along with balance NHDP projects are to be constructed. The projects proposed under phase 1 of the esteemed Bharatmala pariyojana programme are under construction.
This mammoth programme has given opportunity to many construction companies to participate in the construction & development works. Many giant construction companies are already involved in the construction phase.
Following is the list of some of construction companies involved in Bharatmala Pariyojana:
Bharatmala Project Contractors List
S No | Project Under Bharatmala | Contractor |
1 |
Ahmedabad–Dholera Expressway |
|
Pkg 1 | Sarkhej (Ahmedabad)–Sindhrej (Ahmedabad) | Sadbhav Engineering |
Pkg 2 | Sindhrej (Ahmedabad)–Vejalaka (Ahmedabad) | Sadbhav Engineering |
Pkg 3 | Vejalaka (Ahmedabad)–Dholera SIR (Ahmedabad) | GHV India |
Pkg 4 | Dholera SIR (Ahmedabad)–Adhelai (Bhavnagar) | MKC Infrastructure Ltd |
2 |
Delhi Mumbai Expressway |
Bharatmala Project contractors list |
2a |
Dnd – Faridabad – Sohna (59 Km) |
|
Pkg 1 | (9 km) – Km 0.000 to Km 9.000 | DRA Infracon |
Pkg 2 | (24 km) – Km 9.000 to Km 33.000 | DRA Infracon |
Pkg 3 | (26 km) – Km 33.000 to Km 59.063 | DRA Infracon |
2b |
Sohna – Vadodara (844 Km) |
|
Pkg 1 | (18 km) – Km 0.000 to Km 18.460 | APCO Infratech |
Pkg 2 | (29 km) – Km 18.460 to Km 46.960 | APCO Infratech |
Pkg 3 | (32 km) – Km 46.960 to Km 78.760 | Centrodorstroy India |
Pkg 4 | (37 km) – Km 78.760 to Km 115.660 | HG Infra Engineering |
Pkg 5 | (36 km) – Km 115.660 to Km 151.800 | KCC Buildcon |
Pkg 6 | (31 km) – Km 151.800 to Km 182.960 | KCC Buildcon |
Pkg 7 | (31 km) – Km 182.960 to Km 214.220 | Gawar Constructions |
Pkg 8 | (33 km) – Km 214.220 to Km 247.270 | HG Infra Engineering |
Pkg 9 | (46 km) – Km 247.270 to Km 292.910 | HG Infra Engineering |
Pkg 10 | (26 km) – Km 292.910 to Km 319.360 | Dhaya Maju Infra – Crescent EPC |
Pkg 11 | (12 km) – Km 319.360 to Km 330.990 | Larsen & Toubro (L&T) |
Pkg 12 | (28 km) – Km 330.990 to Km 359.130 | GR Infraprojects |
Pkg 13 | (29 km) – Km 359.130 to Km 388.380 | CDS Infra Projects |
Pkg 14 | (31 km) – Km 388.380 to Km 418.960 | Dhaya Maju Infra – Crescent EPC JV |
Pkg 15 | (8 km) – Km 418.960 to Km 427.260 | Dilip Buildcon (DBL) |
Pkg 16 | (25 km) – Km 427.260 to Km 452.390 | DRA Infracon |
Pkg 17 | (32 km) – Km 452.390 to Km 484.390 | JCEC – MKC Infra JV |
Pkg 18 | (33 km) – Km 484.390 to Km 517.390 | GR Infraprojects |
Pkg 19 | (30 km) – Km 517.390 to Km 546.890 | JCEC – MKC Infra JV |
Pkg 20 | (25 km) – Km 546.890 to Km 572.190 | GHV (India) |
Pkg 21 | (30 km) – Km 572.190 to Km 602.390 | GR Infraprojects |
Pkg 22 | (25 km) – Km 602.390 to Km 627.390 | Larsen & Toubro |
Pkg 23 | (25 km) – Km 627.390 to Km 652.690 | GR Infraprojects |
Pkg 24 | (21 km) – Km 652.690 to Km 673.740 | GR Infraprojects |
Pkg 25 | (23 km) – Km 673.740 to Km 696.890 | GR Infraprojects |
Pkg 26 | (30 km) – Km 696.890 to Km 726.390 | Atlas Constructions – NKC JV |
Pkg 27 | (29 km) – Km 726.390 to Km 755.390 | GHV India |
Pkg 28 | (26 km) – Km 755.390 to Km 780.890 | GHV India |
Pkg 29 | (23 km) – Km 780.890 to Km 803.390 | PNC Infratech |
Pkg 30 | (22 km) – Km 803.390 to Km 824.890 | Patel Infrastructure |
Pkg 31 | (19 km) – Km 824.900 to Km 844.350 | PNC Infratech |
2c |
Vadodara – Virar (354 Km) |
|
Pkg 1 | (24 km) – Km 355.000 to Km 378.740 | VK1 Expressway |
Pkg 2 | (32 km) – Km 323.000 to Km 355.000 | IRCON Vadodara Kim Expressway |
Pkg 3 | (31 km) – Km 292.000 to Km 323.000 | Patel Vadodara-Kim Expressway |
Pkg 4 | (13 km) – Km 279.000 to Km 292.000 | Ashoka Ankleshwar Manubar Expressway |
Pkg 5 | (25 km) – Km 254.430 to Km 279.000 | Sadbhav Kim Expressway |
Pkg 6 | (37 km) – Km 217.500 to Km 254.430 | GR Infraprojects |
Pkg 7 | (28 km) – Km 190.000 to Km 217.500 | IRB Infastructure Developers |
Pkg 8 | (35 km) – Km 154.600 to Km 190.000 | Roadway Solutions India Infra |
Pkg 9 | (27 km) – Km 128.000 to Km 154.600 | Roadway Solutions India Infra Ltd. |
Pkg 10 | (25 km) – Km 103.400 to Km 1280.00 | Roadway Solutions India Infra |
Pkg 11 | (26 km) – Km 77.000 to Km 103.400 | RKC Infrabuilt |
Pkg 12 | (26 km) – Km 50.700 to Km 77.000 | Montecarlo |
Pkg 13 | (27 km) – Km 26.582 to Km 50.700 AND 0.000 to 3.000 | GR Infraprojects |
2d |
Virar – Jnpt (92 Km) |
|
Pkg 1 | (17 km) – Km 3.000 to Km 20.200 | IRCON International |
Pkg 2 | (23 km) – Km 20.200 to Km 43.000 | Agroh Infrastructure Developers |
Pkg 3 | (27 km) – Km 43.000 to Km 69.700 | Shivalaya Construction Co. |
Pkg 4 | (10 km) – Km 69.700 to Km 79.780 | IRCON International |
Pkg 5 | (15 km) – Km 79.780 to Km 94.290 | DPR in Progress. Tender Notice Pending |
3 |
Delhi Meerut Expressway |
Bharatmala Project contractors list |
Pkg 1 | Nizamuddin Bridge to Delhi/UP Border | Welspun Delhi Meerut Expressway Private Limited |
Pkg 2 | Delhi/UP Border – Dasna | Apco Infratech Ltd – Chetak Enterprises Ltd JV |
Pkg 3 | Dasna – Hapur | Apco Infratech Ltd – Chetak Enterprises Ltd JV |
Pkg 4 | Dasna to Partapur on Meerut Bypass | GR Infraprojects |
Pkg 5 | Zainuddinpur to Jahidpur connector | APS Hydro Pvt. Ltd. – Mathiyan Construction Pvt. Ltd. (JV) |
4 |
Bangalore Chennai Expressway |
Bharatmala Project contractors list |
4a |
Phase 1 ( Karnataka ) |
|
Pkg 1 | (26.40 km): Bangalore to Malur (Km 0.000 to Km 26.400) | Dilip Buildcon |
Pkg 2 | (27.10 km): Malur to Bangarpet (Km 26.400 to Km 53.500) | Dilip Buildcon |
Pkg 3 | (17.50 km): Bangarpet to Bethamangala (Km 53.500 to Km 71.000) | KCC Buildcon is Lowest Bidder |
4b |
Phase 2 (Andhra Pradesh & Tamil Nadu) |
|
Pkg 1 | (25 km): Bethamangala – Baireddypalle (Km 71.000 to Km 96.000) | Montecarlo Ltd. (MCL) |
Pkg 2 | (31 km): Baireddypalle to Bangarupalem (Km 96.000 to Km 127.000) | APCO Infratech Pvt. Ltd. |
Pkg 3 | (29 km): Bangarupalem to Gudipala (Km 127.000 to Km 156.000) | Dilip Buildcon Ltd. (DBL) |
4c |
Phase 3 (Tamil Nadu) |
|
Pkg 1 | (24 km): Gudipala to Walajahpet (Km 156.000 to Km 180.000) | Montecarlo Ltd. (MCL) |
Pkg 2 | (24.5 km): Walajahpet to Arakkonam (Km 180.000 to Km 204.500) | KCC Buildcon |
Pkg 3 | (25.5 km): Arakkonam to Kancheepuram (Km 204.500 to Km 230.000) | DP Jain Infra is Lowest Bidder |
Pkg 4 | (32.1 km): Kancheepuram to Sriperambadur (Km 230.000 to Km 262.100) | RCC is Lowest Bidder |
5 |
Delhi Amritsar Katra Expressway Contractors List |
Bharatmala Project contractors list |
5a |
Phase 1 |
|
Pkg 1 | (34 km): Jasaur Kheri on KMP Expressway to Junction with Rohtak Panipat road (NH 709) near Rukhi Paani village (Km 0.000 to Km 34.000) | KCC Buildcon Pvt. Ltd. |
Pkg 2 | (26.80 km): Junction with Rohtak Panipat road (NH709) near Rukhi Paani village to Junction with Jind Panipat road (NH352A) near Gangana (Km 34.000 to Km 60.800) | CDS Infra Projects Ltd. |
Pkg 3 | (30.6 km): Junction with Jind-Panipat road NH352A near Gangana village to Junction with Jind Karnal road NH709A near Alewa village (Km 60.800 to Km 91.400) | KCC Buildcon Pvt. Ltd. |
Pkg 4 | (28.85 km): Junction with Jind Karnal road NH709A near Alewa to Junction with Ambala Kaithal Hissar road NH152 near Kharak Pandwa village (Km 91.400 to 120.250) | NKC Projects |
Pkg 5 | (37.67 km): Junction with Ambala Kaithal Hissar road NH152 to Junction with Patiala Samana Patran road SH10 (Km 120.250 to Km 157.920) | CDS Infraprojects Ltd. |
Pkg 6 | (30.91 km): Junction with Patiala-Samana-Patran road (SH-10) near Ghagga village to Junction with Patiala-Bathinda road (NH-7) near Bhawanigarh (Km 157.920 to Km 188.830) | Shiv Build India – Mehta Construction Co. JV |
Pkg 7 | (36.94 km): Junction with Patiala-Bathinda road (NH-7) near Bhawanigarh to Junction with Ludhiana-Malerkotla road (SH-11) near Bhogiwal village (Km 188.830 to Km 225.770) | Ceigall India Ltd. |
Pkg 8 | (35.09 km): Junction with Ludhiana Malerkotla road SH11 near Bhogiwal village to Junction with Ludhiana Moga road NH-5 near Mullanpur Dakha (Km 225.770 to 260.860) | Evrascon – MKC Infrastructure Ltd. (JV) |
Pkg 9 | (43.04 km): Junction with Ludhiana Moga road NH 5 near Mullanpur Dakha to Junction with Jalandhar Moga road NH 703 near Kang Sahibu village (Km 260.860 to Km 303.900) | Evrascon – MKC Infrastructure Ltd. (JV) |
Pkg 10 | (15.5 km): Junction with Jalandhar Moga road (NH-703) Kang Sahibu village to Junction with Jalandhar Kapurthala road (NH703A) near Khojewal village (Km 303.900 to Km 319.400) | Evrascon – MKC Infrastructure Ltd. (JV) |
Pkg 11 | (43.02 km): Junction with Jalandhar-Kapurthala road NH-703A near Khojewal village to Junction with Amritsar-Tanda road NH-503A near Sri Hargobindpur (Km 319.400 to Km 362.420) | Evrascon – MKCIL JV |
Pkg 12 | (35.28 km) : Junction with Amritsar-Tanda road (NH-503A) near Sri Hargobindpur to Junction with Pathankot-Gurdaspur road (NH-54) near Gurdaspur (Km 362.420 to Km 397.700) | Evrascon – MKCIL JV |
Spur Pkg 1 | (40.90 km) : Nakodar to MDR Junction at ch.40.900 Dhunda Village-Junction with NH3 near Goindwal Sahib | 6 bids received in Jan 2022 |
Spur Pkg 2 | (30.05 km): MDR Junction at ch.40.900 Dhunda Village to Junction with NH3 and Taran taran Bypass near Mannawalla village Ch 70.950 | Ceigall India – Krishna Constructions JV |
Spur Pkg 3 | (28.07 km): NH3 and Taran taran Bypass near Mannawalla village Ch 70.950 to NH354 Ajanala road near Harsh china village Ch 99.020 | Joint Stock Company Industrial Association Vozrozhdenie |
5b |
Phase 2 (Greenfield & Brown field) |
|
Pkg 13 | (25.8 km): Details Awaited (397.700 to Km 423.500) | Tender Notice Pending |
Pkg 14 | (44.6 km): Junction with Pathankot Gurdaspur Rd NH54 near Balsua to Junction with Hiranagar Rd near Gurha Baildaran (Km 423.500 to Km 468.100) | Megha Engineering and Infrastructure Ltd. (MEIL) |
Pkg 15 | (35.15 km): Junction with Hiranagar Rd near village Gurha Baildaran to Junction with Jammu Ring Rd NH244A near Jakh village (Km 468.100 to Km 503.250) | Vishwa Samudra Engineering Pvt. Ltd. |
Pkg 16 | (11.8km): Development of Jakh (Vijaypur) Kunjwani section of NH-44 to 6-lane Expressway standards (Design Km 503.200 to Km 515.000 of Ch. 0 to 7.385 of NH-144A Spur Connectivity to Jammu Airport) | Shivalaya Construction Co. Pvt. Ltd. |
Pkg 17 | (13.3 km + 15.62 km) Development of Kunjwani to Sidhra Section of NH-44 (Km 515.000 to Km 528.300) and Domel to Katra Section (Km 550.900 to Km 566.520) | Bidding Underway |
6 |
Amritsar – Jamnagar Economic Corridor |
Bharatmala Project contractors list |
6a |
Amritsar – Bathinda Expressway |
|
Pkg 1 | (39 km): From village Tiba on NE-5A to junction with Moga Jalandhar Road (NH-703) near Dharmkot (from km 0+000 to 39+000) | GR Infraprojects (GRIL) |
Pkg 2 | (54 km): Junction with Moga Jalandhar Road (NH-703) near Dharmkot to Junction with Bhata Bhai Ka-Bhadaur Road near Dyalpura Bhai Ka (from 39+000 to km 93+000) | Krishna Constructions |
Pkg 3 | (61.866 km): Junction with Bhagta Bhai Ka-Bhadaur Road near Dyalpura Bhai Ka to Junction with Mandi Dabwali Bathinda Road on Nh-54 near Sangat Kalan (km 93+000 to 154+866) | Krishna Constructions |
6b |
Sangariya / Chautala – Rasisar Expressway |
|
Pkg 1 | (29 km): km 0.300 to km 28.700 |
Krishna Constructions
|
Pkg 2 | (24 km): km 28.700 to km 53.000 |
Winner Unknown
|
Pkg 3 | (24 km): km 53.000 to km 88.000 |
Krishna Constructions ; New Contractor: DRA IPL-GCC JV
|
Pkg 4 | (27 km): km 88.000 to km 115.000 |
Krishna Constructions
|
Pkg 5 | (27 km): km 115.000 to km 140.000 |
Raj Shyama Constructions
|
Pkg 6 | (30 km): km 140.000 to km 170.000 |
Gawar Constructions
|
Pkg 7 | (25 km): km 170.000 to km 200.000 |
Rajendra Singh Bhamboo Infra – AG Constructor JV (contract terminated)
|
Pkg 8 | (25 km) |
VRC Construction (India) – S&P Infrastructure Developers
|
Pkg 9 | (28 km) |
Raj Shyama Constructions – RCC Developers
|
6c |
Rasisar – Deogarh Expressway |
|
Pkg 1 | (28 km): km 1.900 to km 30.000 | NKC Projects |
Pkg 2 | (30 km): km 30.000 to km 60.000 | NKC Projects |
Pkg 3 | (30 km): km 60.000 to km 90.000 | NKC Projects |
Pkg 4 | (30 km): km 90.000 to km 120.000 |
VRC-VCL-CIL JV
|
Pkg 5 | (28 km): km 120.000 to km 148.000 | NKC Projects |
Pkg 6 | (30 km): km 148.000 to km 177.658 | NKC Projects |
6d |
Deogarh – Sanchore Expressway |
|
Pkg 1 | 22 km |
Winner Unknown
|
Pkg 2 | 27 km |
Winner Unknown
|
Pkg 3 | (24 km): km 48.000 to km 72.000 | NKC Projects |
Pkg 4 | (25 km): km 72.000 to km 97.000 |
Lakshmi Infrastructure & Developers
|
Pkg 5 | (28 km) km 97.000 to km 125.000 | NG Project |
Pkg 6 | (35 km) km 125.000 to km 150.000 |
Lakshmi Infrastructure & Developers
|
Pkg 7 | (30 km): km 150.000 to km 180.000 |
Lakshmi Infrastructure & Developers
|
Pkg 8 | (27 km): km 180.000 to km 208.242 |
JiangXi Construction Engineering – MKC Infrastructure JV
|
6e |
Sanchore – Santalpur Expressway |
|
Pkg 1 | (30 km): km 4.888 to km 35.000 |
Winner Unknown
|
Pkg 2 | (32 km): km 35.000 to km 67.000 |
Ravi Infrabuild Projects
|
Pkg 3 | (32 km): km 67.000 to km 99.000 |
Winner Unknown
|
Pkg 4 | (31 km): km 99.000 to km 130.073 |
CDS Infra Projects
|
7 |
Ludhiana – Rupnagar Expressway |
|
Pkg 1 | (37.70 km): Design chainage 0.000 to chainage 37.700 |
GR Infraprojects (GRIL)
|
Pkg 2 | (46.80 km): Design chainage 37.700 to chainage 66.000 AND Ludhiana Bypass (Ludhiana Ring Road) design chainage 0.000 to chainage 18.500 |
Ceigall India Ltd
|
Pkg 3 | (44.50 km): Design chainage. 66.000 to chainage 91.000 AND spur to Kharar design chainage 0.000 to chainage 19.500 |
IRCON International Ltd.
|
8 |
Trans-Haryana Expressway |
|
Pkg 1 | (23 km): Ismailabad on NH-152 to Junction with Karnal-Pehowa road SH-9 near Dhand (Ch 0.000 to Ch 23.000) | JianXi Construction Engineering – CEIGALL – Shiv Build India JV |
Pkg 2 | (33 km): Junction with Karnal-Pehowa road SH-9 to Junction with Kaithal-Safidon SH-11 road near Rajound (Ch 23.00 to 56.00) | Gawar Constructions |
Pkg 3 | (24 km): Junction with Kaithal-Safidon road SH-11 near Rajound to JN with Jind-Safidon road SH-14 near Kheri village (Ch 56.00 to 80.00) | Galfar Engineering & Contracting (India) |
Pkg 4 | (28 km): Junction with Jind-Safidon road near Kheri village to Junction with NH-352 (Jind-Gohana section) near Julana (Ch. 80.000 to 108.000) | JianXi Construction Engineering – Shiv Build India JV |
Pkg 5 | (23 km): Junction with NH-352 (Jind-Gohana) near Julana to Junction with NH-9 (Rohtak-Jind section) near Kharkara (Ch. 108.000 to 131.000) | Gawar Constructions |
Pkg 6 | (34 km): Junction with NH-9 (Rohtak-Jind section) near Kharkara to Junction with NH-334B (Charkhi Dadri-Jhajjar section) near Charkhi Dadri (Ch. 131.000 to 165.000) | Gawar Constructions |
Pkg 7 | (35 km): Junction with NH-334B (Charkhi Dadri-Jhajjar section) near Charkhi Dadri to Junction with Rewari-Kanina road (SH-24) near Kanina (Ch. 165.000 to 200.000) | Gawar Constructions – Shivalaya Construction Co. JV |
Pkg 8 | (27.02 km): Junction with Rewari-Kanina road (SH-24) near Kanina to Narnaul (Ch. 200.000 to 227.020) | Gawar Constructions |
9 |
Delhi – Dehradun Expressway |
|
9a |
Phase 1 |
|
Pkg 1 | (14.75 km) – Akshardham NH-9 Junction to Delhi-UP border (Ch.0.00 to Ch.14.750) in Delhi. This consists of a 6.4 km elevated road between between Geeta Colony and Khajoori Khas. | Gawar Constructions |
Pkg 2 | (16.85 km) – Delhi/UP Border to EPE Junction (Ch.14.750 to Ch. 31.200) in Uttar Pradesh. This consists of an 11.2 elevated section. | Gayatri Projects |
9b |
Phase 2 |
|
Pkg 1 | (27 km) – EPE near Khekra to Lohadda village (Km 0 to Km 27.000) | Raj Shyama is lowest bidder (7 bids received in retender) |
Pkg 2 | (29.5 km) – Lohadda village to Karaunda Mahajan village (Km 27.000 to Km 56.500) | Krishna Constructions |
Pkg 3 | (25.5 km) – Karaunda Mahajan village to Khyawari village (Km 56.500 to Km 82.000) | Shiv Build India Pvt. Ltd. – Jandu Construction India Pvt. Ltd. (JV) |
Pkg 4 | (37.068 km) – Khyawari village to Latifpur village at Saharanpur Bypass (Km 82.000 to Km 119.068) | Krishna Constructions |
9c |
Phase 3 |
|
Pkg 2 | Six laning and full access control provisions in stretches from Saharanpur Bypass to Ganeshpur | Bidding Underway |
9d |
Phase 4 |
|
Pkg 1 | (8.13 km) – chainage 0+000 (Ganespur) to design chainage 8+130 (near Mohand) of NH-72A | Vasishta Constructions is the Lowest Bidder |
Pkg 2 | (8.25 km) – Chainage 8.130 near Mohand to 16.380 Daat kali Tunnel of NH-72A | Ram Kumar is the Lowest Bidder |
10 |
Chittoor – Thatchur Expressway |
|
Pkg 1 | (43.80 m): km 0.000 to 43.800 | KCC Buildcon Pvt. Ltd. |
Pkg 2 | (17.58 km): km 43.800 (Kumarajapet) to km 61.380 (Veera Kaveri Raja Puram) | EKK Infrastructure Ltd. |
Pkg 3 | (34.66 km): km 61.380 to km 96.040 | KNR Constructions Ltd. (954.29 crore) |
Pkg 4 | (20.060 km): km 96.040 to km 116.100 | IRB Infrastructure Developers |
11 |
Bangalore–Mysore Expressway |
Bharatmala Project contractors list |
Pkg 1 | Bengaluru – Nidaghatta (58 km) | Dilip Buildcon Ltd. (DBL) |
Pkg 2 | Nidaghatta – Mysore (61 km) | Dilip Buildcon Ltd. (DBL) |
12 |
Ludhiana – Bathinda Expressway |
Bharatmala Project contractors list |
Pkg 1 | Junction with Amritsar-Bhatinda Expressway (NH-754A) near Rampura Phul to Junction with Moga-Barnala Road (NH-703) near village Tallewal (km 0+000 to km 30+300) (30.30 km) | Ram Kumar Contractor |
Pkg 2 | Junction with Moga-Barnala Road (NH-703) near village Tallewal to Junction with Delhi-Katra Expressway (NE-5) near Ludhiana (village Ballowal) (km 30+300 to km 75+543) (45.243 km) | Ceigall India Ltd. |
13 |
Bangalore Satellite Town Ring Road |
Bharatmala Project contractors list |
Pkg 1 | (42 kms): 4 laning from Km 0.00 to Km 42.00 of Dobaspet to Dodaballapur Bypass section of NH-648 (old NH-207) | Shankaranarayana Constructions (SNC) |
Pkg 2 | 6 laning from km 42.000 to km 80.00 of Dodaballapur Bypass to Hoskote section of NH-648 (old NH-207) | Dilip Buildcon (DBL) |
Pkg 1
Phase 1 |
(46.30 kms): Dobbaspet to Magadi (Km. 0.00 to Km. 46.30) | Tender Notice Pending |
Pkg 2
Phase 1 |
(32.70 kms): Magadi to Ramanagara (Km. 46.30 to Km. 79.00) | Tender Notice Pending |
Pkg 1
Phase 2 |
(33.60 kms): Ramanagara to Bannerghatta National Park (Km. 79.00 to Km. 112.60) | Tender Notice Pending |
Pkg 2
Phase 2 |
(8.1 kms): Bannerghatta National Park Elevated Highway (Km. 112.600 to Km. 120.700) | Tender Notice Pending |
Pkg 3
Phase 2 |
(23.78 kms): Bannerghatta National Park to Belagondapalli (TN) from Km. 120.700 to Km. 144.480 | Tender Notice Pending |
Pkg 1
Phase 3 |
(35.766 kms): Balagondapalli (Tamil Nadu) to KA/TN Border (Km 144.170 to Km 179.936) | Montecarlo (MCL) is lowest bidder |
Pkg 2
Phase 3 |
(20.9 kms): 4 lane realignment of old NH-207 (new NH-648) from TN/KA Border (Km 0.000) to Hoskote (Km 20.900) | S&P-SIEPL is lowest bidder |
14 |
Amas – Darbhanga Expressway |
Bharatmala Project contractors list |
Pkg 1 | (55.002 kms): Amas (on NH-02) (Ch.00.000) to village Shivrampur (Ch.55.002) | MEIL |
Pkg 2 | (54.322 kms): Shivrampur (Ch. 55.002 Km) to Ramnagar (Ch. 109.324 kms) | MEIL |
Pkg 3 | (47 kms): Village Kalyanpur (Ch. 0.000) to village Balbhadarpur (Ch. 47.000) | Bid received |
Pkg 4 | (42.09 kms): village Balbhadarpur (Ch 47.000) to Bela Nawada (Ch 89.090) | Bidding Process Underway |
15 |
Bareilly-Ludhiana Economic Corridor |
Bharatmala Project contractors list |
15a |
220 km Bareilly to Shamli (greenfield) |
Yet to be updated |
15b |
Shamli – Ambala Expressway (121.78 km ) |
Bharatmala Project contractors list |
Pkg 1 | (44.90 kms): Gogwan Jalalpur to Ranipur Barsi (Km. 000.600 to 45.500) | Bidding Process Underway |
Pkg 2 | (38.90 kms): Ranipur Barsi to Adhoya Musalmana (Km 45.500 to 84.400) | Bidding Process Underway |
Pkg 3 | (37.386 kms): Adhoya Musalmana to Sadopur (Km 84.400 to 121.786) | Bidding Process Underway |
15c |
90 km section of NH-44 from Ambala to Ludhiana (brownfield upgrade) |
Yet to be updated |
16 |
Raipur – Visakhapatnam Economic Corridor |
|
CG1 | Abhanpur to Magerlod (km 00.000 to km 42.852) | Shalimar Corp |
CG2 | Sargi to Basanwahi (km 42.800 to km 99.500) | Dilip Buildcon Ltd. is the lowest bidder |
CG3 | Basanwahi to Marangpuri (km 99.500 to km 124.661) | KMV Projects is the lowest bidder |
OD1 | Dhanara (Odisha/Chhattisgarh Border) to Hatibena (km 124.611 to km 146.500) | NKC Projects is the lowest bidder |
OD2 | Hatibena to Badakumari (km 146.500 to km 179.000) | Barbrik is the lowest bidder |
OD3 | Badakumari to Karki (km 179.000 to km 226.500) | Adani Transport lowest bidder |
OD4 | Karki to Kaliagura (km 226.500 to km 249.000) | NKC Projects lowest bidder |
OD5 | Boriguma to Dasamantpur (km 249.000 to km 293.000) | HG Infra Engineering lowest bidder at Rs. 1338.27 cr |
OD6 | Koraput to Pattangi (km 293.000 to km 338.500) | HG Infra Engineering lowest bidder at Rs. 958.98 cr |
OD7 | Baraja to Kandili | DRA Infracon lowest bidder |
OD8 | Kandili to Tumbigura | Max Infra (India) lowest bidder |
OD9 | Scope Unknown | Tender Notice Pending |
OD10 | Scope Unknown | Tender Notice Pending |
OD11 | Scope Unknown | Tender Notice Pending |
AP Package 1 | Aluru to Jakkuva (km 365.033 to km 396.800) | HG Infra lowest bidder |
AP Package 2 | Jakkuva to Korlam (km 396.800 to km 421.100) | NKC Projects lowest bidder |
AP Package 3 | Korlam to Kantakapalle (km 421.100 to km 445.100) | PSK Infrastructures and Projects lowest bidder |
AP Package 4 | Kantakapalle to Sabbavaram (km 445.100 to km 464.662) | NKC Projects is the lowest bidder |
17 |
Solapur-Chennai Economic Corridor |
Bharatmala Project contractors list |
17a |
Maharashtra – Karnataka Section (Akkalkot, MH to Karnataka/Telangana Border) |
Bharatmala Project contractors list |
Pkg 1 | (26.00 kms) Akkalkot to MH/KN Border at Badadal (km 0.000 to km 26.000) | Notice yet pending |
Pkg 2 | (71 kms) MH/KA Border at Badadal to Maradgi S. Andola (km 26.000 to km 97.000) | PNC Infra Ltd is lowest bidder |
Pkg 3 | (65.50 kms) Maradgi S. Andola to Baswantpur (97.000 to km 162.500) | Dilip Buildcon Ltd is lowest bidder |
Pkg 4 | (40.6 kms) Baswantpur to Singnodi (km 162.500 to km 203.100) | Ashoka Buildcon Ltd is lowest bidder |
17b |
Telangana Section |
Bharatmala Project contractors list |
Pkg 1 | (39.3 km) Karnataka-Telangana border at Raichur Gadwal road to Julekal village (km 202.900 to km 242.200) | MEIL |
Pkg 2 | (38.2 km): Julekal village to Kurnool town terminating on NH-40 (km 242.200 to km 280.400) | Bidding Under Process |
We will regularly update this Bharatmala Project Contractors List time to time.