DND-Faridabad-Ballabhgarh Bypass to Jewar Airport Greenfield Highway Project Information , Route Map & Status

Introduction

Embarking on a visionary journey, the construction of the 6-lane Greenfield connectivity from DND-Faridabad-Ballabhgarh Bypass to Jewar International Airport stands as a monumental project under the umbrella of Bharatmala Pariyojna. This article unveils the intricate details of this transformative endeavor, encompassing its length, route alignment, proposed structures, and the substantial significance it holds for the regions of Haryana and Uttar Pradesh.

Project Overview

  • Project Name: 6-Lane Greenfield Connectivity from DND-Faridabad-Ballabhgarh Bypass to Jewar International Airport
  • Total Length: 31.060 km
  • Project Cost: INR 1906 Crores
  • Right of Way: 60 m
  • Land Acquisition Required: 224 Hectares
  • Estimated Completion Deadline: 2025
  • Agency: National Highways Authority of India

Also Read About-Upcoming Mega Projects in New Delhi 

Route Alignment of DND-Faridabad-Ballabhgarh Bypass to Jewar Airport Greenfield Highway :

The project commences near Chandawali village on the Ballabgarh Bypass Road (Design Ch 0+000) and concludes near Dayant Pur village, Uttar Pradesh (Design Ch 31+425). The starting point’s coordinates are Latitude 28°19’2.57″N and Longitude 77°20’40.50″E, while the ending point lies at Latitude 28°10’36.20″N and Longitude 77°38.60″E.

Interactive Map of  DND-Faridabad-Ballabhgarh Bypass to Jewar Airport Greenfield Highway Project 

Proposed ROW: The proposed right-of-way (ROW) for this section spans 60 meters, accommodating various configurations. Given that this is a pristine greenfield alignment, the construction is planned to ensure smooth connectivity, optimize freight movement, and cater to the burgeoning demands of the region.

Also Read –30 Upcoming Mega Infrastructure Projects in Uttar Pradesh

Proposed Structures on DND-Faridabad-Ballabhgarh Bypass to Jewar Airport Greenfield Highway

This greenfield alignment will host a range of vital structures, ensuring seamless connectivity and efficient traffic flow:

Structure Type Quantity
Major Bridges 1 Nos
Minor Bridges 1 Nos
Minor Bridge cum Underpass 3 Nos
Vehicular Underpasses 7 Nos
Light Vehicular Underpasses 21 Nos
Small Vehicular Underpasses 4 Nos
Fly-Overs including Interchanges 9 Nos
Road Over Bridge (ROB) 1 Nos
Culverts 60 Nos
Bridge over Gas Pipeline 3 Nos

The entirety of this project shall be constructed with a flexible pavement configuration, aligning with the latest standards (IRC: SP: 87-2019).

Also Read- Upcoming Mega Projects in Haryana

Wayside Amenities and Environmental Stewardship

Wayside amenities will form an integral part of the project, aiming to provide essential facilities for travelers, including parking areas, fuel stations, rest areas, and more. The project’s alignment underscores environmental responsibility, with efforts to retain existing villages and minimize ecological impact.

Raw Material Requirements and Socio-Economic Impact

The construction of this connectivity necessitates a diverse range of raw materials, including steel, bitumen, aggregates, cement, and more. Furthermore, the project’s socio-economic impact is notable, generating employment opportunities and fostering growth in surrounding areas.

Raw Material Quantity
Steel 9,469 Tonnes
Bitumen 15,339 Tonnes
Bituminous Emulsion 926 Tonnes
Coarse Aggregates 3,515 CUM
Cement 664 Tonnes
Fine Aggregates 56,066 CUM

Also Read –30 Upcoming Mega Infrastructure Projects in Uttar Pradesh

Land Acquisition and Afforestation Initiatives

A pivotal aspect of the project involves land acquisition. Approximately 224 hectares of land are slated for acquisition. As part of the project’s commitment to environmental sustainability, a compensatory plantation plan is in place, with 17,524 trees set to be planted as part of afforestation efforts.

Conclusion

The 6-lane Greenfield connectivity from DND-Faridabad-Ballabhgarh Bypass to Jewar International Airport signifies a stride towards modernization, connectivity, and progress. By creating a seamless route, this project will foster economic development, alleviate traffic congestion, and contribute to the region’s growth story.

Also Read About-17 Upcoming Mega Projects In Punjab

Leave a Comment